Users who have used air coolers know that air coolers are indeed a good product based on energy saving, environmental protection, ventilation, cooling, and dust removal. Everyone wants to use good products. So how can we ensure that the effect of air coolers can be kept to the best? In good condition? If our factory has a professional electrician, can you install it yourself? What should be paid attention to? In order to let everyone have no worries when buying the product, and feel more at ease when using the product, it is necessary to explain the precautions for installing the air cooler here one by one:


1. Before installing the air cooler, observe the location of the equipment in the workshop, the distribution of personnel and the outdoor environment. For example, there are not many people in the workshop. If you want to reduce the temperature as a whole, you should directly choose the direct air blower installation. If the equipment has a large heat source, then you must choose to install air ducts to supply air to the posts and ensure that each post has a vent.


2. If the workshop area is not large and the width is about 20 meters, under normal circumstances, an 18-type 18000 air-volume air cooler is used for ventilation and cooling. If the workshop is more than 30 meters wide and can only install equipment on one side, then consider The 30-type 30,000 air volume main engine is ventilated and cooled, and it cannot be generalized. The specific situation depends on the actual situation.

Industrial Air Cooler

3. When installing the equipment, for the sake of safety, engineers must wear engineering hats and safety belts before they can work. If the height is more than 3 meters, they must use scaffolding to avoid accidents.


4. When installing the equipment, if there is a need to punch holes, be sure to measure the size before opening the holes. After the equipment is installed, it must be repaired in time to avoid water leakage.


5. When installing the equipment at high altitude, you must pay attention to the tools and materials in your hand. If it is an air duct, you must hang the wire. The 18-type mounting frame is best made of 40*40 galvanized angle iron, which is safe Stable and easy to maintain.


6. All fixing screws must be tightened, generally fixed with 10*10 expansion screws.


7. After the equipment is installed and the site is cleaned, you must test the machine in time after the water and electricity is connected to see if the host is in good condition. If you have any questions, you can directly contact the manufacturer: 18006758057


In fact, Siboly air cooler China can be used for 8-10 years or even longer under normal use and on-time maintenance. Siboly air cooler manufacturer China has been focusing on evaporative air cooling for more than 15 years, and it has been the most used for a long time. High-quality products and considerate service treat every user with high customer satisfaction.